Product Description
Metal fabrication mezzanine floors wholesale prefabricated house building parking garage
A steel construction material steel building is a prefabricated structure that uses steel as the primary construction material. It is designed as a workshop or industrial facility, typically for heavy-duty operations or activities.
The prefabricated building components are manufactured in a factory and then assembled on-site. Prefabrication offers several advantages, including faster construction time, higher quality control, and reduced on-site construction waste.
The steel used in these buildings is chosen for its strength and durability, making it capable of supporting heavy loads and withstanding demanding conditions. Steel provides a strong framework for machinery, equipment, and other industrial operations.
Product Parameters
Steel building material component:
I |
Main steel frame |
1. |
Steel structure frame |
Welded H steel |
Q235B/Q355B |
Painting/Hot-dip galvanized |
2. |
Wall/Roof purlin |
C/Z steel |
Q235B |
Galvanized |
II |
Bracing Part |
1. |
Tie Rod |
∅89/114/158 |
Q235B |
Painting/Hot-dip galvanized |
2. |
Flexible Bracing |
∅16/18/20 |
Q235B |
Painting/Hot-dip galvanized |
3. |
Sag rod |
∅20 |
Q235B |
Galvanized |
4. |
Brace Rod |
∅32 |
Q235B |
Galvanized |
5. |
Knee-brace |
L50 |
Q235B |
Painting/Hot-dip galvanized |
III |
Roof & Wall Part |
1. |
Roof /Wall panel |
Steel sheet |
0.326~0.7mm corrugated steel sheet |
Insulated sandwich panel |
EPS, Glass wool/Rock wool/PU insulated |
2. |
Roof/Wall trimming |
Ridge roof panel |
0.4~0.5 mm steel sheet |
Flashing |
0.4~0.5 mm steel sheet |
Gable wall trimming |
0.4~0.5 mm steel sheet |
Wall corner trimming |
0.4~0.5 mm steel sheet |
IV |
Window & Door part |
1. |
Window |
PVC/Aluminum frame |
Single/double glazing (Fixed/sliding/swing) |
2. |
Door |
Rolling/sliding door |
Automatic and manual method |
V |
Accessories |
1. |
Bolts |
Anchor bolts, High strength bolts, Galvanized bolts, Turnbuckle, shear stud |
2. |
Gutter |
Steel sheet/galvanized/Stainless steel(304) |
3. |
Downpipe |
PVC 110/160 |
4. |
Roof Ventilator |
∅600 (Galvanized) |
Processing workshop display
Steel Building Advantages
Steel building offers several advantages over other construction materials:
1) It has high strength and durability withstands heavy loads, and harsh environmental conditions, and has a long lifespan.
2)This kind of prefabricated steel building allows for faster assembly on-site, reducing construction time and enabling early occupancy.
3)Steel frame offers great design flexibility, allowing for customizable shapes and sizes to meet specific steel project requirements.
4)It is a cost-effective choice compared to other materials, offering good value for money in terms of initial construction and long-term maintenance.
5)Steel structure building can provide expansive interior spaces without the need for load-bearing interior walls, accommodating large machinery and equipment.
6)Proper insulation like EPS, glass wool, and rock wool can be incorporated into steel workshops or steel warehouse buildings enhancing energy efficiency and reducing heating and cooling costs.
Steel Building Application
Design Parameters
The information we need for the design of steel structure buildings/workshops/warehouses/godowns is as follows:
1). What are the specifications of the steel building you need? (Length, width, and height. The height of the building can greatly affect the cost.)
2). For what purpose is your steel building used? (Factory, workshop, warehouse, hangar, plant, poultry farm shed, etc.)
3). Thermal conditions of your steel building. (EPS, glass wool, rock wool, PU)
4). Lighting conditions of your steel building. (Ventilation/skylight)
5). Requirements for windows and doors. (Roll-up door/sliding door/steel door/ PVC door)
6). Wind load/snow load of the steel building. (To design a safe structure that can withstand the weather conditions)
7). Does the steel building have a crane? (3/5/10/15 tons)
Packaging & Shipping
After choosing us
(1)We will offer a Proforma Invoice(PI) for you.
(2)We can arrange the shipment if necessary, because we have a close relationship with some shipping company.
(3)We can accept the third party to check the goods before delivery.
(4)We will ensure on-time delivery.
(5)We will give feedback in every stage of production.
(6)We have a skillful load team that loads containers nicely.
(7)We will offer detailed installation drawings in English to guide the on-site assembly work.
(8)If necessary, we can send engineers on-site to guide the installation.